Drilling & foundations

Hard rock, faster holes, fewer tooth changes.

Complex 42 is a concentrated drilling additive for hard-rock piling, bored piers, exploration, and geotech work. In documented field trials it has delivered penetration rates up to 3.4x faster, bit life 80–90% longer, and roughly 40–45% less fuel per hole.

4.5x faster cutting Taj Mahal quartzite.
Field trial, Ultimate Stone, Elk Grove Village, Illinois
3.5x faster per hole, on half the fuel.
Field trial, hard basalt piling, SR60 rig

Proof

Hard basalt piling trial — SR60 rig, 600 mm piles, adjacent holes, 1% Complex 42.

WithoutWith Complex 42Change
Time per hole630 min180 min3.5x faster
Fuel per hole436 L216 L50% less
Teeth per hole681282% fewer

Each treated hole used 3 to 5 liters of Complex 42.

What changes when you add it to your water

  • Penetration rate up to 3.4x faster.
  • Bit and tooth life 80–90% longer.
  • Fuel use down roughly 40–45%.
  • Fewer drill-string jams.
  • Less wear on bit, bearings, mud pump, and pipe.
  • Rig runs quieter with less vibration.

The First Cut Test, on your rig

One hole or one shift. We set the dosing rate with your crew by phone and send a before/after log sheet for drilling time, footage, fuel, and tooling changes. The test costs you nothing but an hour.