The First Cut Test

The First Cut Test.

One saw, your worst material, fresh water first, then dosed. Matt or Jeff will call within one business day to set the dose and get your test kit shipped. We'll send the log sheet — the gauge does the talking.

Download the First Cut Test log sheet (PDF)

Prefer to talk first? Call Jeff at (502) 387-0303 or Matt at (859) 533-3188.