Stone fabrication

Quartzite and porcelain shouldn't cost you a blade a week.

Hard, brittle, and unforgiving — the materials customers want most are the ones that chip on the cut and eat diamond tooling. S Complex changes the way the blade meets the slab.

What changes when you add it to your water

  • Cutting speeds go up by multiples on the hardest materials. See the trials below.
  • Blades last 30–50% longer in linear feet of cut.
  • Chipping and breakout drop, so there's less edge work after the cut.
  • Machine amperage barely rises even at higher speeds. Your operators will see it on the gauge.
  • The saw runs noticeably quieter, especially on porcelain and sintered stone.

Proof

Dario — Trademark Universal Stone, Louisville

Ultimate Stone — Elk Grove Village, Illinois. Sabre Jet XT bridge saw, 0.8% S Complex in the water feed.

MaterialFresh waterWith S ComplexChange
Taj Mahal quartzite30 in/min135 in/min4.5x faster
Iceberg quartzite20 in/min95 in/min4.75x faster

After the trial, the shop cut a full Iceberg quartzite kitchen in 12 minutes. It normally took an hour.

Hard Rock Stone Works — Sterling Heights, Michigan. Robo SawJet, 1% S Complex, recycled water system.

MaterialFresh waterWith S ComplexChange
Dekton75 in/min250 in/min3.3x faster
Engineered quartz112 in/min250 in/min2.2x faster

250 in/min is the saw's programmed maximum. The shop had never run it above 145. No chips, no blowouts, and no effect on the water-recycling system.

We no longer dread cutting ultra-compact and sintered slabs.
Managing director, stone fabrication shop, three months in

Your stack

Four products, one loop: the additive goes in, the water gets recycled, the slurry gets handled, and the buildup comes off.

Dose at 1:250 for natural stone, 1:125 when you're also cutting porcelain or sintered stone. A Dosatron holds that ratio automatically.

The First Cut Test, on your floor

One saw, one material you dread, two weeks. We set the Dosatron with you by phone. Cut against fresh water first, then dosed, and log inches per minute and amps on the sheet we send. The test costs you nothing but an hour.