A full quartzite kitchen in 12 minutes instead of an hour.
Ultimate Stone, Elk Grove Village, Illinois, 2021. Sabre Jet XT bridge saw, 0.8% S Complex.
Request the full trial report
Ran the saw at its maximum speed for the first time. No chips.
Hard Rock Stone Works, Sterling Heights, Michigan, 2021. Robo SawJet, 1% S Complex, recycled water.
Request the full trial report
One hole. 3.5x faster, half the fuel, 82% fewer teeth.
Hard basalt piling trial, 2024. SR60 rig, 1% Complex 42.
Request the full trial report
A 2–3 hour runway cut, finished in 57 minutes.
Airport runway, 2021. Road saw, 1% C Complex.
Airport runway cut, 2021. A road saw dosed at 1% C Complex cut 118 linear meters at 430 mm depth in 57 minutes. The contractor said the same cut normally took two to three hours on that site. Slurry stayed close to the cut and vacuumed up easily, with minimal blade wear.
Request the full trial report
Three months in, chipping on sintered slabs was gone.
Stone fabrication shop, 2019.
A fabricator running S Complex on its saws for three months reported a large production increase, cleaner cuts, chipping and cracking on ultra-compact and sintered slabs resolved, and noticeably less noise on the hardest materials.
Request the full trial report
Full trial reports available on request.